Tags /

Barclays offices, Nicosia
2013 – Completed

Built Area: 594 m2
Client: Barclays Wealth
Design Architect: TP Bennett
Local Architect: Photiou Architects
Project Management: Photiou Architects
Structural Engineer: Ross & Partners
Services Engineer: Foreman Roberts
Quantity Surveyor: Northcraft/Acumen Consultants
General Contractor: Terra Construction Ltd
Photography: Christos Papantoniou

In developing the design for Nicosia we established a spatial and organisational strategy based on previous experience of fit-outs for Barclays, tuned to the specific characteristics of the Globe House Building.

The client suite has been located on the mezzanine level in a dedicated area with direct access from the secure lobby on ground floor. This also provides appropriate separation from the open plan office areas.

Support areas have been located to the central area of the mezzanine floor space where daylight levels are lowest.